How much does concrete cost in Orlando and Central Florida?
In 2026, installed concrete in the Orlando area typically costs $10–$13 per square foot for our standard 4,000 psi fiber-reinforced broom finish, $13–$17 for exposed aggregate and $15–$22 for stamped and colored. A 600 sq ft two-car driveway in the standard mix is about $6,000–$7,800. Final prices come from a free written estimate after we see the site.
These are installed prices: they cover the work, equipment and finishing as well as the concrete itself. National averages run lower or higher depending on the region and the specification, so use the ranges here as a Central Florida starting point.
What does concrete cost per square foot by mix and finish?
The typical installed range is $8–$10 per square foot for a budget 3,000 psi broom finish and $10–$13 for our residential standard, 4,000 psi with fiber. Decorative finishes cost more because they add labor, color, sealer and skill. Heavy-vehicle slabs add thickness and rebar.
| Mix or finish | Typical installed price per sq ft |
|---|---|
| 3,000 psi, broom finish (budget) | $8–$10 |
| 4,000 psi with fiber, broom finish (our residential standard) | $10–$13 |
| Exposed aggregate | $13–$17 |
| Stamped and colored | $15–$22 |
| 5,000 psi with rebar (RVs, boats, heavy trucks) | $14–$18 |
| Removing the old driveway | adds $1.50–$3.50 |
What does a 1-, 2- or 3-car concrete driveway cost?
A two-car driveway of about 600 sq ft typically costs $6,000–$7,800 in our standard mix. A one-car driveway of about 300 sq ft runs $3,000–$3,900, and a three-car driveway of about 900 sq ft runs $9,000–$11,700. Each total is the size multiplied by the per-square-foot range.
| Finish | Per sq ft | 1-car, about 300 sq ft | 2-car, about 600 sq ft | 3-car, about 900 sq ft |
|---|---|---|---|---|
| 3,000 psi broom | $8–$10 | $2,400–$3,000 | $4,800–$6,000 | $7,200–$9,000 |
| 4,000 psi fiber, broom (standard) | $10–$13 | $3,000–$3,900 | $6,000–$7,800 | $9,000–$11,700 |
| Exposed aggregate | $13–$17 | $3,900–$5,100 | $7,800–$10,200 | $11,700–$15,300 |
| Stamped and colored | $15–$22 | $4,500–$6,600 | $9,000–$13,200 | $13,500–$19,800 |
| 5,000 psi with rebar | $14–$18 | $4,200–$5,400 | $8,400–$10,800 | $12,600–$16,200 |
Add $1.50–$3.50 per square foot if an old driveway must come out first. More detail on options is on our concrete driveways page, and our driveway extension guide covers widening an existing one.
What do concrete patios, pads, steps and sidewalks cost?
A broom-finish concrete patio typically costs $11–$16 per square foot installed, and a stamped patio $15–$23. Small patios cost more per square foot, so the small sizes below sit at the high end or above the per-foot range once minimums apply. A 250 sq ft broom patio is about $2,800–$4,000, and a stamped one about $4,000–$5,800.
| Patio size | Broom finish ($11–$16) | Stamped ($15–$23) |
|---|---|---|
| 12x12 (144 sq ft) | about $1,600–$2,300 | about $2,200–$3,300 |
| 10x20 (200 sq ft) | about $2,200–$3,200 | about $3,000–$4,600 |
| 20x20 (400 sq ft) | about $4,400–$6,400 | about $6,000–$9,200 |
| 20x30 (600 sq ft) | about $6,600–$9,600 | about $9,000–$13,800 |
- Pad or small slab (100–300 sq ft): about $1,200–$4,000; small-job minimums apply.
- Steps: about $250–$500 per step.
- Residential sidewalk or walkway, 4 inches, broom finish: $8–$12 per square foot. Commercial sidewalks, 5–6 feet wide and 4–6 inches thick, are $10–$15. See our sidewalks page.
Stamped work is covered in more depth on our stamped concrete and concrete patios pages. If you are weighing materials for a patio or driveway, our concrete vs. pavers comparison lays out both sides.
What do resurfacing, repair and removal cost?
Resurfacing an existing slab typically costs $4–$8 per square foot for a plain overlay, up to $9–$14 for a stamped overlay. Crack repair on a typical residential driveway is about $200–$600, and lifting a sunken slab with foam injection about $400–$1,500. Removing an old slab adds $1.50–$3.50 per square foot.
- Plain overlay: $4–$8 per sq ft. Spray-knockdown texture: $5–$9. Stenciled overlay: $7–$12. Stamped overlay: $9–$14.
- Joint repair and sealing: $4–$8 per linear foot.
- Epoxy garage floor, 2-car: single color $2,200–$3,500, flake $2,800–$4,400, polyaspartic $3,400–$5,200. See epoxy floors.
An overlay only works on a slab that is structurally sound, so we check for movement before quoting. Our pages on resurfacing and concrete repair explain the options, and the guide to driveway cracks in Florida helps you tell cosmetic cracks from serious ones.
What is the spec behind the price?
The spec behind our residential price is 4 inches of 4,000 psi concrete with fiber reinforcement and control joints. For RVs, boats and heavy trucks, the slab is typically 5–6 inches thick with rebar, which is why the heavy-duty line costs more. Thickness, strength and joints are what separate a driveway that lasts from one that cracks early.
- Thickness: 4 inches is typical for cars and light trucks; 5–6 inches for heavy vehicles.
- Strength: 4,000 psi is our residential standard. A 3,000 psi mix is common in budget bids and can be fine for light use, but it is a lower-cost mix, not the same product.
- Reinforcement: fiber in the standard mix; rebar for the heavy-duty mix.
- Control joints: cut or tooled so cracking happens in a straight line on purpose. For a 4-inch slab they are typically spaced no more than about 10 feet apart, and about one quarter of the slab's depth.
- Surface: broom, exposed aggregate or stamped, which sets most of the per-foot difference.
New concrete also needs care in the first days. Our new concrete curing guide explains what to do and what to avoid.
Why is installed concrete more than the price per yard?
The price per cubic yard covers only the delivered material. Installed concrete also pays for excavation and grading, forms, reinforcement, placing and finishing the slab, cutting joints, curing, cleanup and any permit work, which is why installed cost per square foot is higher than material cost alone. We do not sell ready-mix to the public, so we do not publish a per-yard price; a local batch plant can quote the delivered price.
The useful numbers are about quantity. One cubic yard covers about 81 sq ft at 4 inches thick, or about 54 sq ft at 6 inches. A 600 sq ft driveway at 4 inches therefore needs roughly 7.4 yards, and in practice a little more to allow for uneven ground and waste. A concrete order is also a rush job: once the truck arrives, the crew has a limited window to place and finish, so the labor is skilled and time-sensitive.
What moves a concrete price up or down?
Size, demolition, access, base condition and drainage fixes, finish, thickness and reinforcement, and permit or HOA requirements are the main drivers. Tree roots can add work as well. A small pad costs more per square foot than a large driveway.
- Demolition: removing an old slab adds $1.50–$3.50 per square foot.
- Access: if a truck or pump cannot get close, more labor goes into placing the concrete.
- Base and drainage: we slope surfaces at least 1% away from the structure. Low areas that hold water may need grading or a drainage fix first.
- Finish: broom is the lowest, exposed aggregate is next, and stamped is highest.
- Thickness and reinforcement: a 6-inch slab with rebar uses more material and more labor than a 4-inch slab with fiber, which is the gap between the $10–$13 and $14–$18 lines.
- Tree roots: roots near the slab edge may need to be cut back or the layout adjusted, and that takes extra time on site.
Looking at pavers instead? Our paver cost guide has the matching numbers; typical mid-grade pavers cost $16–$22 per square foot against $10–$13 for standard concrete.
Do concrete prices change from city to city?
No. Our installed prices are the same across the Ocoee, Winter Garden, Orlando, Kissimmee and Clermont area. What changes is the approval route and the site: who issues the permit, whether an HOA reviews the plan, and what is going on with drainage and soil. The table shows the key local point for each area with its source. Rules get updated, so check with the office before you rely on a detail.
| City or area | County | Who handles permits, and the key local rule | Local page |
|---|---|---|---|
| Ocoee | Orange | City of Ocoee permits through its online portal. The city's FAQ says a concrete slab, patio or driveway needs a permit with a site plan (city FAQ); right-of-way work goes through Public Works (city page). | Concrete in Ocoee |
| Winter Garden | Orange | City Building Division, with concrete and driveways submitted as electronic zoning permits and pre-pour and final driveway inspections (city page). An impervious-area worksheet may be required (city FAQ). | Concrete in Winter Garden |
| Orlando | Orange | City Permitting Services. An Engineering Permit covers installing or removing concrete or expanding a driveway; work in the street, sidewalk or grass strip needs a Right-of-Way Permit (city page). | Concrete in Orlando |
| Kissimmee | Osceola | City Engineering Division reviews driveway and sidewalk plans (city page). Slabs are a separate building permit type (2026 rule change). | Concrete in Kissimmee |
| Windermere | Orange | Town of Windermere. New or repaired driveways in the right-of-way use a town application with an inspection fee, and the town's conditions include a 5-foot side-line setback (town form). | Concrete in Windermere |
| Apopka | Orange | City Building Safety (city page) and Engineering Division for right-of-way work (city page). Its fee page lists a driveway inspection fee (fee page). | Concrete in Apopka |
| Clermont | Lake | City Building Services Division (city page). Its fee schedule lists a residential zoning clearance; ask whether it applies to your slab or driveway (fee schedule). | Concrete in Clermont |
| Davenport | Polk | City Building & Planning (city page). Concrete aprons and sidewalks are the default; pavers there need HOA or building-official approval (city rules). | Concrete in Davenport |
| Lake Nona | Orange | Inside the City of Orlando, so Orlando's Engineering Permit and right-of-way rules apply (city page). | Concrete in Lake Nona |
| Dr. Phillips | Orange | Unincorporated Orange County. The county says any pouring of concrete or placing of pavers needs a permit (county page); work in the right-of-way needs a recorded use agreement (agreement). | Concrete in Dr. Phillips |
| Four Corners | Lake, Orange, Osceola, Polk | The parcel's county decides. Lake County's adopted code exempts some driveways and sidewalks near grade level (Lake County list); Orange County requires a permit for any concrete pour (Orange County). | Concrete in Four Corners |
| Celebration | Osceola | Unincorporated Osceola County for permits (county driveway application); the Celebration architectural review committee has its own driveway guideline (driveway guideline). | Concrete in Celebration |
Our permits and HOA guide explains the statewide rules and what to prepare. For the places we serve, see our service areas page.
How do I get an exact concrete price?
Call (689) 356-6292 or use our contact page for a free written estimate. We measure the area, check access, drainage and what needs to come out, and write down the mix, thickness, finish and any permit work. Written warranty terms are on our warranty page. We work seven days a week, 7am–8pm, and carry general liability and workers' compensation insurance; the certificate is available on request.