All Paver Services All Concrete Services Pavers — Ocoee Pavers — Winter Garden Concrete — Ocoee Concrete — Winter Garden Our 38-Point Process Warranty About Blog Contact Call: (689) 356-6292
★★★★★Central Florida · Founded 2020

Concrete Parking Lots & Sections
Orlando & West Orange County, FL

New concrete lots, expansions, panel replacement, joint sealing and accessible spaces for commercial and multi-family properties.

Scope

What concrete parking lot work do you do?

We build new concrete parking lots and lot sections, replace failed panels, seal joints, repair cracks and settlement, add accessible spaces and ramps, and pour aprons and dumpster pads, all in concrete. We work on small and mid-size commercial lots: retail, offices, multi-family and HOA properties in Ocoee, Orlando and West Orange County.

Lot-wide repair on a failing section is covered in more detail on our concrete repair page, and broader property work is on the commercial concrete page.

Pricing 2026

How much does a new concrete parking lot cost?

A new concrete parking lot in the Orlando area typically costs $10–$16 per sq ft installed in 2026. A 5,000 sq ft lot works out to roughly $50,000–$80,000, and a 10,000 sq ft lot to roughly $100,000–$160,000, before any site work outside our scope.

Lot sizeTypical installed range
2,000 sq ft (small lot or expansion)about $20,000–$32,000
5,000 sq ftabout $50,000–$80,000
10,000 sq ftabout $100,000–$160,000

Price moves with the thickness and reinforcement the traffic requires, demolition of the existing surface, base condition and drainage fixes, access for trucks, and how much of the lot must stay open during the work. Phasing a lot to keep part of it open takes longer and can add cost.

A written, itemized estimate comes after a site visit. Equipment and dumpster pads are priced separately by size.

Thickness

How thick should a concrete parking lot be?

Concrete for passenger-vehicle parking is typically 5 inches thick, and areas with delivery or garbage trucks are typically 6 inches or more, often with steel reinforcement. The right number depends on the soil, the truck loads and the engineer or owner’s plans.

Control joints are cut so the slab cracks where it is designed to. Joint spacing is set by the slab thickness and the plans. If an engineer has specified a section for your property, we build to that drawing.

Concrete vs asphalt

Is concrete or asphalt better for a parking lot in Florida?

Concrete costs more up front but typically lasts about 30 years or longer with little more than joint sealing, while asphalt typically needs sealcoating every few years and resurfacing sooner. We install concrete only; we do not pave or sealcoat asphalt.

ConcreteAsphalt
Up-front costHigherLower
Typical service life in FloridaOften 30+ yearsOften 15–20 years with maintenance
Routine maintenanceJoint sealing, crack repairSealcoating, patching, restriping
Heat and standing waterStays rigid, lighter and cooler surfaceCan soften and rut in summer sun
Repair methodReplace one panelPatch or mill and overlay

Concrete usually makes sense when a property is held long term, heavy trucks use it, or ongoing patching budgets are unwelcome. Asphalt can win when the lowest first cost or the fastest turnaround matters most. Both are reasonable choices, and the right one depends on how long you plan to own the lot. These service-life figures are typical, not guaranteed.

Accessible spaces

How do accessible parking spaces and ramps fit into a concrete lot?

Accessible spaces need a level surface, a firm route to the entrance, and ramps with detectable warning surfaces where the route meets the street or drive, and concrete is a common material for all three. We pour the concrete portions and coordinate with whoever is doing your striping and signage.

The governing standard is the federal ADA Standards for Accessible Design, and Florida adds its own accessibility code. Your plans or local building department confirm the exact requirements for your site, and we build to those plans.

Maintenance

What maintenance does a concrete parking lot need?

A concrete lot mainly needs its joints sealed, small cracks filled, and standing water kept off it; it does not need sealcoating. A short yearly walk-through catches problems while they are still cheap to fix.

Panel and crack repair techniques are described on our concrete repair page. Settled panels can often be lifted with foam instead of replaced, for a fraction of the cost.

Drainage

How is drainage handled on a concrete parking lot?

A concrete lot is graded so water runs to drains or swales instead of pooling, because standing water is what breaks down the base under any pavement. Central Florida’s summer storms test a lot’s drainage every afternoon.

Stormwater permits and engineered drainage plans are handled by the property owner’s engineer where required. We build to the approved plan and tell you when we see a drainage problem at the site visit. A free written estimate comes first.

FAQ

Concrete Parking Lot FAQ

How long does a commercial concrete lot take to build?

It depends on size, phasing and weather. A small lot or section can be done in days, while a larger lot is usually planned over weeks with curing time before traffic returns. We give a written schedule with the estimate.

Can you replace only the damaged panels in my parking lot?

Yes. Failed concrete panels are saw-cut, removed and re-poured, and the joints are sealed. That is usually much cheaper than rebuilding the whole lot.

Do you repair or sealcoat asphalt lots?

No. We install and repair concrete only. For asphalt paving or sealcoating you would need an asphalt company, and we can still pour concrete aprons, pads or ramps next to an asphalt lot.

Do you stripe the parking spaces?

Striping is typically done by a separate striping company after the concrete cures. We coordinate with them on timing so the lines go down at the right stage.

How soon can cars use a new concrete lot?

Concrete is typically open to light vehicles after about 7 days and to heavy trucks after longer, depending on the mix and weather. We confirm the date for your job in writing.

Can the work be scheduled to keep part of the lot open?

Often, yes. We can phase the work in sections, or schedule evening or weekend crews, so tenants and customers keep access. Phasing takes longer, and we plan it with you at the estimate.

Free Estimate

Same-day response · 7 days a week · No obligation

(689) 356-6292
Free Estimate Form